Research Article
Variation of Rock Mass Pressure during Tunnel Construction in Phyllite Stratum
Table 1
On-site monitoring measurement project and method of the Mingyazi tunnel.
| Number | Monitoring content | Instrument | Monitoring frequency |
| 1 | Clearance convergence | TOPCON (OS-600G) total station | 1–15 days | 1-2 times/day | 16 days-1 month | 1 time/day | 1 month later | 1-2 times/week |
| 2 | Crown settlement | TOPCON (OS-600G) total station | 1–15 days | 1-2 times/day | 16 days-1 month | 1 time/day | 1 month later | 1-2 times/week |
| 3 | Rock mass pressure and contact pressure | Pressure sensor | 1 time/day |
|
|