Research Article

Generation-Load Coordinative Scheduling considering the Demand-Response Uncertainty of Inverter Air Conditioners

Table 3

The potential of IACs aggregators.

TimeAggregator AAggregator BAggregator C

12:00The potential of load reduction (kW)419040
14:30Controllable duration (min)42.840.337.4
Total load reduction (kW)171

12:30The potential of load reduction (kW)357528
13:00Controllable duration (min)48.643.538.7
15:00Total load reduction (kW)138

13:30The potential of load reduction (kW)449944
Controllable duration (min)41.53933
Total load reduction (kW)187

14:00Potential of load reduction (kW)4610550
Controllable duration (min)38.634.230.2
Total load reduction (kW)201

Variance of responsive deviation of single IAC0.150.060.14