Table 3
The potential of IACs aggregators.
| Time | | Aggregator A | Aggregator B | Aggregator C |
| 12:00 | The potential of load reduction (kW) | 41 | 90 | 40 | 14:30 | Controllable duration (min) | 42.8 | 40.3 | 37.4 | | Total load reduction (kW) | 171 | | |
| 12:30 | The potential of load reduction (kW) | 35 | 75 | 28 | 13:00 | Controllable duration (min) | 48.6 | 43.5 | 38.7 | 15:00 | Total load reduction (kW) | 138 | | |
| 13:30 | The potential of load reduction (kW) | 44 | 99 | 44 | Controllable duration (min) | 41.5 | 39 | 33 | Total load reduction (kW) | 187 | | |
| 14:00 | Potential of load reduction (kW) | 46 | 105 | 50 | Controllable duration (min) | 38.6 | 34.2 | 30.2 | Total load reduction (kW) | 201 | | |
| Variance of responsive deviation of single IAC | 0.15 | 0.06 | 0.14 | Variance of responsive deviation of IACs aggregators | 1.5 | 1.0 | 2.0 |
|
|