Research Article

Transient Antiseepage Analysis of the Relief Well in Beijiang Dike

Table 2

Grid independence validation (unit: m).

Pressure tube head0.7 m grid1 m grid1.3 m gridMeasured value

B011.3811.3811.3811.38
B110.8610.8210.8810.71
B210.2410.210.1810.17
B39.769.749.759.76