Research Article
Optimal Operation Strategy of Flexible Interconnected Distribution Network Based on SES-VSC-MTDC
Table 7
Comparison of operation results of three scenarios.
| Scene | Reliability | Abandoned wind and solar (MWh) | Comprehensive power supply cost (¥) |
| I | Poor | 15.48 | 102312.53 | II | Good | 0.27 | 86811.52 | III | Excellent | 0 | 85579.46 |
|
|