Research Article

Optimization of Multiobjective Configuration of Multienergy Microgrid Based on HMM and Typical Scenarios: A Case Study of Smart Park

Table 5

The probability parameters of the typical scene.

Scene typeScene 1Scene 2Scene 3Scene 4Scene 5Scene 6Scene 7Scene 8Scene 9Scene 10Scene 11Scene 12

System electrical load average (kW)210324622985198430572563332326762478263222792853
System thermal load average (kW)452649875857379332964087308943904216495753133255
System cooling load average (kW)19241521963126226752019298316431932248826281585
Average price of upstream wholesale market (yuan)0.340.260.640.630.710.560.530.410.790.650.780.68
Mean wind speed (m/s)7.65.76.26.84.17.05.19.68.59.16.96.6
Mean radiation intensity (kW/m2)0.750.520.240.790.870.490.630.430.760.790.350.45
Scene occurrence probability0.130.070.150.020.060.060.070.050.060.150.060.07