Research Article
Maintenance Optimization Based on Three-Stage Failure Process under Performance-Based Contracting
Table 1
Overview of application domains, revenue functions, funds limit, and theory based, by the main reviewed contributions.
| Ref. | Application domain | Type of revenue function | Consider the funds limit? | Theory based |
| Kim et al. [24] | Spares inventory | — | — | Principal-agent model | Nowicki et al. [25] | Spares inventory | Linear exponential step | No | Metric | Mirzahosseinian and Piplani [26] | Spares inventory | — | — | Metric; Queueing theory; Markov model | Jin and Tian [27] | Spares inventory and reliability | — | — | Reliability optimization; inventory management | Jin and Wang [28] | Spares inventory and reliability | — | — | Reliability optimization; inventory management | Mirzahosseinian and Piplani [29] | Spares inventory and reliability | — | — | Metric | Kang et al. [30] | Spares inventory and reliability | — | — | Simulation | Jin et al. [31] | Spares inventory and reliability | — | — | Game theoretical; Metric | Patriarca et al. [32] | Spares inventory | — | — | Metric | Mirzahosseinian et al. [33] | Spares inventory and reliability | — | — | Reliability optimization; inventory management | Xiang et al. [34] | Maintenance policy | Linear | No | Stochastic degradation process; CBM | Qiu et al. [35] | Maintenance policy | Linear | No | Virtual age model | Hur et al. [36] | Spares inventory | — | No | Markov chain | Yang et al. [37] | Maintenance policy | Linear | No | Two-stage preventive maintenance model | Patra et al. [38] | Spares inventory and reliability | Nonlinear | No | Principal-agent model; Time-series model | Wang et al. [39] | Maintenance policy | Linear; Exponential | No | Time-series model | Wang et al. [40] | Maintenance policy | Linear | No | Degradation-threshold-shock model | Li et al. [41] | Maintenance policy | Exponential | No | Time-series model | This paper | Maintenance policy | Step; Linear | Yes | Three-stage preventive maintenance model |
|
|