Research Article
Construction Safety Risk Assessment of Large-Sized Deep Drainage Tunnel Projects
Table 1
HHM framework of LSDDTP construction safety risk.
| Dimensions | Loss | Unit | Source | Safety accidents types |
| Primary index | Loss of life | Design unit | Men | Object against | Fall | Loss of property | Construction unit | Mechanical | Collapse | Fire | Loss of environment | Owner unit | Material | Water permeable | Electric shock | ā | Government | Method | Explosion | Mechanical injury | ā | Other units | Environment | Poisoning and suffocation | Other injuries |
| Dimensions | Risk characteristics | Causes of risk | Control error | Construction unit |
| Primary index | Danger | Initial accident | Management level | Main sewage tunnel project | Exposure | Vulnerability | Secondary accident | Operation level | Shaft project | Adaptability |
|
|