Integration of Interpretive Structural Modeling with Fuzzy Bayesian Network for Risk Assessment of Tunnel Collapse
Table 11
Occurrence probability, posterior probability, and ranking of each factor.
| Total index | Factor | Probability of occurrence | Posterior probability | Yes | Rank | Yes | Probability change | Rank |
| Geological aspects | Y1 | 0.651 | 1 | 0.662 | 0.011 | 4 | Y2 | 0.265 | 4 | 0.269 | 0.004 | 10 | Y3 | 0.108 | 13 | 0.114 | 0.006 | 8 | Y4 | 0.154 | 9 | 0.154 | 0.000 | 14 | Y5 | 0.071 | 15 | 0.071 | 0.000 | 14 | Y6 | 0.324 | 2 | 0.325 | 0.001 | 12 |
| Survey and design aspects | Y7 | 0.157 | 8 | 0.157 | 0.000 | 14 | Y8 | 0.077 | 14 | 0.087 | 0.010 | 5 |
| Construction aspects | Y9 | 0.234 | 5 | 0.244 | 0.010 | 5 | Y10 | 0.140 | 12 | 0.161 | 0.021 | 3 | Y11 | 0.146 | 11 | 0.155 | 0.009 | 7 | Y12 | 0.154 | 10 | 0.263 | 0.109 | 2 | Y13 | 0.212 | 6 | 0.374 | 0.162 | 1 |
| Organizational management aspects | Y14 | 0.160 | 7 | 0.166 | 0.006 | 8 | Y15 | 0.068 | 16 | 0.069 | 0.001 | 12 | Y16 | 0.044 | 17 | 0.044 | 0.000 | 14 |
| Natural aspects | Y17 | 0.271 | 3 | 0.273 | 0.002 | 11 |
|
|