Research Article
Integration of Interpretive Structural Modeling with Fuzzy Bayesian Network for Risk Assessment of Tunnel Collapse
Table 8
A priori probability calculation result of root node Y14.
| Parameter symbol | Numerical value | Parameter symbol | Numerical value | Parameter symbol | Numerical value |
| E1 | L(0, 0.1, 0.3) | S12 | 0.83333 | S24 | 0.83333 | E2 | ML(0.1, 0.3, 0.5) | S13 | 1.00000 | S25 | 0.83333 | E3 | L(0, 0.1, 0.3) | S14 | 1.00000 | S34 | 1.00000 | E4 | L(0, 0.1, 0.3) | S15 | 1.00000 | S35 | 1.00000 | E5 | L(0, 0.1, 0.3) | S23 | 0.83333 | S45 | 1.00000 | AA(E1) | 0.95833 | RA(E1) | 0.20536 | w(E1) | 0.25500 | AA(E2) | 0.83333 | RA(E2) | 0.17856 | w(E2) | 0.21600 | AA(E3) | 0.95833 | RA(E3) | 0.20536 | w(E3) | 0.15700 | AA(E4) | 0.95833 | RA(E4) | 0.20536 | w(E4) | 0.19600 | AA(E5) | 0.95833 | RA(E5) | 0.20536 | w(E5) | 0.17600 | CC(E1) | 0.23018 | EAG | (0.019728, 0.139456, 0.339456) | | 0.160 | CC(E2) | 0.19728 | CC(E3) | 0.18118 | CC(E4) | 0.20068 | CC(E5) | 0.19068 |
|
|