Research Article
Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times
Table 6
Best performance for lower bounds compared to the optimal solutions.
| n | Minimum RPG (%) | LB1 | LB3 | LB4 | LB5 | NewLB |
| 5 | 0.588 | 0.000 | 28.016 | 24.307 | 0.000 | 6 | 0.612 | 0.000 | 38.782 | 26.099 | 0.000 | 7 | 0.992 | 0.000 | 44.013 | 44.013 | 0.000 | 8 | 0.539 | 0.000 | 49.653 | 36.025 | 0.000 | 9 | 0.676 | 0.000 | 51.385 | 49.497 | 0.000 | 10 | 1.585 | 0.000 | 49.195 | 38.452 | 0.000 | 11 | 1.374 | 0.527 | 53.663 | 50.815 | 0.000 | 12 | 2.260 | 0.888 | 60.482 | 55.103 | 0.000 | 13 | 0.463 | 0.463 | 50.210 | 42.344 | 0.000 | 14 | 1.718 | 0.000 | 61.760 | 55.880 | 0.000 | 15 | 3.064 | 1.000 | 64.293 | 51.660 | 0.180 |
|
|