Research Article

Numerical Simulation Research on the Stability of Urban Underground Interchange Tunnel Group

Figure 9

Interception location map from K0 + 840 to K1 + 20 at the interchange of the right line of Qiaocheng and Baopeng ramp. (a) Location map. (b) Stratigraphic map of location.
(a)
(b)