Research Article

Hybrid Algorithm Based on Genetic Simulated Annealing Algorithm for Complex Multiproduct Scheduling Problem with Zero-Wait Constraint

Figure 11

The Gantt chart of Case 1. (a) The minimum makespan is 41, (b) the minimum makespan is 45, and (c) the minimum makespan is 46.
(a)
(b)
(c)