Research Article
Optimal Transportation Scheduling of Prefabricated Components Based on Improved Hybrid Differential Firefly Algorithm
Table 6
Round-trip time of component transportation between the prefabricated factory and the construction site.
| a | j | Daj (km) | Traffic flow | Nontraffic impedance (min) | Traffic impedance (min) | Transportation t0 | Return | Transportation t | Return t′ | (i) | (ii) | (iii) | (i) | (ii) | (iii) | (i) | (ii) | (iii) | (i) | (ii) | (iii) |
| a = 1 | 1 | 18.0 | 3750 | 20 | 20 | 22 | 18 | 18 | 20 | 22 | 21 | 24 | 20 | 19 | 22 | 2 | 21.4 | 3650 | 23 | 23 | 26 | 21 | 21 | 23 | 26 | 25 | 28 | 24 | 23 | 26 | 4 | 15.0 | 3780 | 16 | 16 | 18 | 15 | 15 | 16 | 18 | 18 | 20 | 17 | 16 | 18 | 8 | 30.0 | 3450 | 33 | 33 | 36 | 30 | 30 | 33 | 35 | 34 | 39 | 32 | 32 | 35 | a = 2 | 3 | 18.0 | 3655 | 20 | 20 | 22 | 18 | 18 | 20 | 22 | 21 | 24 | 20 | 19 | 22 | 5 | 33.5 | 3750 | 37 | 37 | 40 | 34 | 34 | 37 | 41 | 39 | 45 | 37 | 36 | 41 | 6 | 12.5 | 3450 | 14 | 14 | 15 | 13 | 13 | 14 | 15 | 14 | 16 | 14 | 13 | 15 | 7 | 20.0 | 3780 | 22 | 22 | 24 | 20 | 20 | 22 | 24 | 23 | 27 | 22 | 21 | 24 | a = 3 | 9 | 25.0 | 3550 | 27 | 27 | 30 | 25 | 25 | 27 | 30 | 29 | 33 | 27 | 26 | 30 | 10 | 12.5 | 3560 | 14 | 14 | 15 | 13 | 13 | 14 | 15 | 14 | 16 | 14 | 13 | 15 | 11 | 20.0 | 3450 | 22 | 22 | 24 | 20 | 20 | 22 | 24 | 23 | 26 | 22 | 21 | 24 | 12 | 11.3 | 3360 | 12 | 12 | 14 | 11 | 11 | 12 | 13 | 13 | 15 | 12 | 12 | 13 |
|
|