The Selection of the Best Control Rule for a Multiple-Load AGV System Using Simulation and Fuzzy MADM in a Flexible Manufacturing System

Table 1

Summary of AGV dispatching rules.

Vehicle initiatedWorkstation initiated

First-Come-First-Served (FCFS)Farthest Vehicle (FV)
First-Encountered-First-Served (FEFS)First Available Vehicle (FAFS)
Largest Queue Size (LQS)Least Cumulative Idle Time (LIT)
Longest Inter-Arrival Time (LIT)Least Utilized Vehicle (LUV)
Longest Travel Time (LTT)Longest Idle Vehicle (LIV)
Longest Waiting Time (LWT)Most Cumulative Idle Vehicle (MIT)
Maximum demand (MD)Nearest (Idle) Vehicle (NV or NIV)
Maximum Outgoing Queue Size (MOQS)Random Vehicle (RV)
Minimum Remaining Outgoing Queue (MROQS)
Minimum Work-in-Queue (MWQ)
Modified First-Come-First-Served (MFCFS)
Random Workstation (RW)
Shortest time to Travel First (STTF)
Unit Load Shop Arrival Time (ULSAT)
Vehicle Looks For Work (VLFW)