Research Article

The Selection of the Best Control Rule for a Multiple-Load AGV System Using Simulation and Fuzzy MADM in a Flexible Manufacturing System

Table 4

The processing-time distribution and the production sequence of each product type.

Work stationProcessing time distribution (min)Work stationProcessing time distribution (min)

2N (1,0.1)7N (2,0.2)
3N (1.5,0.15)8N (1.5,0.15)
4N (2,0.2)9N (1.5,0.15)
5N (1,0.1)10N (2,0.2)
6N (2,0.2)11N (1,0.1)