The Selection of the Best Control Rule for a Multiple-Load AGV System Using Simulation and Fuzzy MADM in a Flexible Manufacturing System
Table 4
The processing-time distribution and the production sequence of each product type.
| Work station | Processing time distribution (min) | Work station | Processing time distribution (min) |
| 2 | N (1,0.1) | 7 | N (2,0.2) | 3 | N (1.5,0.15) | 8 | N (1.5,0.15) | 4 | N (2,0.2) | 9 | N (1.5,0.15) | 5 | N (1,0.1) | 10 | N (2,0.2) | 6 | N (2,0.2) | 11 | N (1,0.1) |
|
|