Research Article

Alleviating the Collision States and Fleet Optimization by Introducing a New Generation of Automated Guided Vehicle Systems

Table 2

The nondeterministic variables and product sequence.

VariableWorkstations (W) or RAGVs or products (P)Distribution (seconds) or sequence

Processing time at W2, W3WNormal (150, 5)
Processing time at W4, W5, W6WNormal (100, 8)
Processing time at W7, W8, W9WNegExp (90)
All repair timeWNormal (2500, 110)
Time between failureWNormal (140000, 986)
All repair timeRAGVNormal (850, 80)
Time between failureRAGVNormal(85000, 503)
Demand per dayP1Normal (40, 5)
Demand per dayP2Normal (31, 2)
Demand per dayP3Normal (62, 8)
SequenceP1W2, W3, W5, W7, W9
SequenceP2W2, W3, W6, W4, W7, W8, W9
SequenceP3W3, W5, W7, W8