Research Article

A Study of the Location of the Entrance of a Fishway in a Regulated River with CFD and ADCP

Figure 10

Fishway inlet at position 2 with 0° and 45° angle. The flow rate through the power plant is 750 m3/s, and the velocities are shown at 1 m depth.
327929.fig.0010a
(a)
327929.fig.0010b
(b)