Research Article

A Study of the Location of the Entrance of a Fishway in a Regulated River with CFD and ADCP

Figure 9

Fishway inlet at position 1 with 0° and 45° angle. The flow rate through the power plant is 750 m3/s, and the velocities are shown at 1 m depth.
327929.fig.009a
(a)
327929.fig.009b
(b)