Research Article
Developing a Chaotic-Simulation Based Model for Ranking High Selected Network Links in Hazardous Material Transportation
Table 2
Risk and cost priorities scenarios.
| Scenario | Priorities | Risk | Cost |
| A1 | 0.0 (0%) | 1.0 (100%) | A2 | 0.3 (30%) | 0.7 (70%) | A3 | 0.5 (50%) | 0.5 (50%) | A4 | 0.7 (70%) | 0.3 (30%) | A5 | 1.0 (100%) | 0.0 (0%) |
|
|