Research Article

Combined DFT and Fuzzy Based Faulty Phase Selection and Classification in a Series Compensated Transmission Line

Table 11

Simulation results for the heavy load interconnection (FIA = 0° and FL = 165 km).

Simulated system dataResults obtained from the proposed CDFTF-based scheme
LoadSwitching instant (s)Response time (ms)Fault type
P (in MW)Q (in MVAr)Phase APhase BPhase CGround G

5003000.50000No fault
8006000000No fault
10008000000No fault