Research Article
Power Grid Estimation Using Electric Network Frequency Signals
Table 6
The accuracy and F1 score of power grid estimation on multimedia data (trained 70%, averaged over 20 rounds).
| Time (hour) | Number of data points () | Number of multimedia | Accuracy | F1 score | Proposed with SVM (%) | Proposed with XGBoost (%) | Proposed with SVM | Proposed with XGBoost |
| 0.25 | 60 | 374 | 83.23 | 85 | 0.75 | 0.79 | 0.5 | 120 | 199 | 82.92 | 94.17 | 0.75 | 0.93 | 1 | 240 | 20 | 68.82 | 99.92 | 0.56 | 0.99 |
|
|