Research Article

Information Security Risk Assessment Method for Ship Control System Based on Fuzzy Sets and Attack Trees

Table 2

The possibility of evaluation criteria when .

Attack CostProbability  
Interval
Attack DifficultyProbability  
Interval
Detected PossibilityProbability  
Interval

Very High(0.006,0.120,0.234)Very High(0.006,0.120,0.234)Very High(0.006,0.120,0.234)
High(0.196,0.310,0.424)High(0.196,0.310,0.424)High(0.196,0.310,0.424)
Medium(0.386,0.500,0.614)Medium(0.386,0.500,0.614)Medium(0.386,0.500,0.614)
Low(0.576,0.690,0.804)Low(0.576,0.690,0.804)Low(0.576,0.690,0.804)
Very Low(0.766,0.880,0.994)Very Low(0.766,0.880,0.994)Very Low(0.766,0.880,0.994)