Table of Contents Author Guidelines Submit a Manuscript
Scientific Programming
Volume 2017, Article ID 1680813, 14 pages
https://doi.org/10.1155/2017/1680813
Research Article

Inexact Multistage Stochastic Chance Constrained Programming Model for Water Resources Management under Uncertainties

1College of Water Conservancy and Hydropower, School of Science, Hebei University of Engineering, Handan 056038, China
2College of Arts, Hebei University of Engineering, Handan 056038, China
3School of Economics and Management, Handan University, Handan 056038, China

Correspondence should be addressed to Minghu Ha; nc.ude.uebeh@uhgnimah

Received 25 December 2016; Accepted 23 May 2017; Published 20 June 2017

Academic Editor: Fabrizio Riguzzi

Copyright © 2017 Hong Zhang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. X. M. Liu, G. H. Huang, S. Wang, and Y. R. Fan, “Water resources management under uncertainty: factorial multi-stage stochastic program with chance constraints,” Stochastic Environmental Research and Risk Assessment, vol. 30, no. 3, pp. 945–957, 2016. View at Publisher · View at Google Scholar · View at Scopus
  2. J. Gao and F. You, “Optimal design and operations of supply chain networks for water management in shale gas production: MILFP model and algorithms for the water-energy nexus,” AIChE Journal, vol. 61, no. 4, pp. 1184–1208, 2015. View at Publisher · View at Google Scholar · View at Scopus
  3. Z. Hu, Y. Chen, L. Yao, C. Wei, and C. Li, “Optimal allocation of regional water resources: From a perspective of equity-efficiency tradeoff,” Resources, Conservation and Recycling, vol. 109, pp. 102–113, 2016. View at Publisher · View at Google Scholar · View at Scopus
  4. T. Roach, Z. Kapelan, R. Ledbetter, and M. Ledbetter, “Comparison of robust optimization and info-gap methods for water resource management under deep uncertainty,” Journal of Water Resources Planning and Management, vol. 142, no. 9, Article ID 04016028, 2016. View at Publisher · View at Google Scholar · View at Scopus
  5. M. G. Rojas-Torres, F. Nápoles-Rivera, J. M. Ponce-Ortega, M. Serna-González, G. Guillén-Gosálbez, and L. Jiménez-Esteller, “Multiobjective optimization for designing and operating more sustainable water management systems for a city in Mexico,” AIChE Journal, vol. 61, no. 8, pp. 2428–2446, 2015. View at Publisher · View at Google Scholar · View at Scopus
  6. Y. Tu, X. Zhou, J. Gang, M. Liechty, J. Xu, and B. Lev, “Administrative and market-based allocation mechanism for regional water resources planning,” Resources, Conservation and Recycling, vol. 95, pp. 156–173, 2015. View at Publisher · View at Google Scholar · View at Scopus
  7. J. Liu, Y. P. Li, G. H. Huang, and X. T. Zeng, “A dual-interval fixed-mix stochastic programming method for water resources management under uncertainty,” Resources, Conservation and Recycling, vol. 88, pp. 50–66, 2014. View at Publisher · View at Google Scholar · View at Scopus
  8. Y. L. Xie, G. H. Huang, W. Li, J. B. Li, and Y. F. Li, “An inexact two-stage stochastic programming model for water resources management in Nansihu Lake Basin, China,” Journal of Environmental Management, vol. 127, pp. 188–205, 2013. View at Publisher · View at Google Scholar · View at Scopus
  9. Y. P. Li, G. H. Huang, and S. L. Nie, “An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty,” Advances in Water Resources, vol. 29, no. 5, pp. 776–789, 2006. View at Publisher · View at Google Scholar · View at Scopus
  10. Y. Zhou, G. H. Huang, and B. Yang, “Water resources management under multi-parameter interactions: a factorial multi-stage stochastic programming approach,” Omeg, vol. 41, no. 3, pp. 559–573, 2012. View at Publisher · View at Google Scholar · View at Scopus
  11. M. Q. Suo, Y. P. Li, G. H. Huang, Y. R. Fan, and Z. Li, “An inventory-theory-based inexact multistage stochastic programming model for water resources management,” Mathematical Problems in Engineering, vol. 2013, Article ID 482095, 2013. View at Publisher · View at Google Scholar · View at Scopus
  12. F. Chen, G. H. Huang, and Y. R. Fan, “Inexact multistage fuzzy-stochastic programming model for water resources management,” Journal of Water Resources Planning and Management, vol. 141, no. 11, Article ID 04015027, 2015. View at Publisher · View at Google Scholar · View at Scopus
  13. Y. P. Li, G. H. Huang, Z. F. Yang, and S. L. Nie, “IFMP: interval-fuzzy multistage programming for water resources management under uncertainty,” Resources, Conservation and Recycling, vol. 52, no. 5, pp. 800–812, 2008. View at Publisher · View at Google Scholar · View at Scopus
  14. Y. P. Li, G. H. Huang, Y. F. Huang, and H. D. Zhou, “A multistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management,” Environmental Modelling and Software, vol. 24, no. 7, pp. 786–797, 2009. View at Publisher · View at Google Scholar · View at Scopus
  15. A. Charnes and W. W. Cooper, “Chance-constrained programming,” Management Science, vol. 6, no. 1, pp. 73–79, 1959. View at Publisher · View at Google Scholar · View at MathSciNet
  16. R. Rossi, S. Armagan Tarim, B. Hnich, S. Prestwich, and C. Guran, “A note on Liu-Iwamura's dependent-chance programming,” European Journal of Operational Research, vol. 198, no. 3, pp. 983–986, 2009. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  17. J. M. Grosso, C. Ocampo-Martínez, V. Puig, and B. Joseph, “Chance-constrained model predictive control for drinking water networks,” Journal of Process Control, vol. 24, no. 5, pp. 504–516, 2014. View at Publisher · View at Google Scholar · View at Scopus
  18. H. Wu, M. Shahidehpour, Z. Li, and W. Tian, “Chance-constrained day-ahead scheduling in stochastic power system operation,” IEEE Transactions on Power Systems, vol. 29, no. 4, pp. 1583–1591, 2014. View at Publisher · View at Google Scholar · View at Scopus
  19. Y. C. Han, G. H. Huang, and C. H. Li, “An interval-parameter multi-stage stochastic chance-constrained mixed integer programming model for inter-basin water resources management systems under uncertainty,” in Proceedings of the 5th International Conference on Fuzzy Systems and Knowledge Discovery, FSKD '08, pp. 146–153, IEEE, Shandong, China, October 2008. View at Publisher · View at Google Scholar · View at Scopus
  20. B. Liu and K. Iwamura, “Fuzzy programming with fuzzy decisions and fuzzy simulation-based genetic algorithm,” Fuzzy Sets and Systems, vol. 122, no. 2, pp. 253–262, 2001. View at Publisher · View at Google Scholar · View at MathSciNet
  21. B. D. Liu, Uncertain Programming, Wiley, New York, NY, USA, 1999.
  22. H. Ke and B. Liu, “Fuzzy project scheduling problem and its hybrid intelligent algorithm,” Applied Mathematical Modelling. Simulation and Computation for Engineering and Environmental Systems, vol. 34, no. 2, pp. 301–308, 2010. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  23. J. W. Gao, J. H. Zhao, and X. Y. Ji, “Fuzzy chance-constrained programming for capital budgeting problem with fuzzy decisions,” in Proceedings of the 2nd International Conference Fuzzy Systems and Knowledge Discovery, FSKD '05, vol. 3613, pp. 304–311, IEEE, Changsha, China, August 2005. View at Publisher · View at Google Scholar
  24. J. Zhou and B. Liu, “New stochastic models for capacitated location-allocation problem,” Computers and Industrial Engineering, vol. 45, no. 1, pp. 111–125, 2003. View at Publisher · View at Google Scholar · View at Scopus
  25. R. Zhao and B. Liu, “Stochastic programming models for general redundancy-optimization problems,” IEEE Transactions on Reliability, vol. 52, no. 2, pp. 181–191, 2003. View at Publisher · View at Google Scholar · View at Scopus
  26. H. Zhang, M. Ha, and H. Xing, “Chance-constrained programming on sugeno measure space,” Expert Systems with Applications, vol. 38, no. 9, pp. 11527–11533, 2011. View at Publisher · View at Google Scholar · View at Scopus
  27. M. Ha, Z. Gao, and X. Wang, “Managing water supply risk through an option contract in uncertain environment,” Journal of Uncertain Systems, vol. 10, no. 2, pp. 114–123, 2016. View at Google Scholar · View at Scopus
  28. Y. P. Li, G. H. Huang, S. L. Nie, and L. Liu, “Inexact multistage stochastic integer programming for water resources management under uncertainty,” Journal of Environmental Management, vol. 88, no. 1, pp. 93–107, 2008. View at Publisher · View at Google Scholar · View at Scopus
  29. D. P. Loucks, J. R. Stedinger, and D. A. Haith, Water resource systems planning and analysis, Prentice-Hall, Upper Saddle River, NJ, USA, 1981.
  30. G. H. Huang and D. P. Loucks, “An inexact two-stage stochastic programming model for water resources management under uncertainty,” Civil Engineering and Environmental Systems, vol. 17, no. 2, pp. 95–118, 2000. View at Publisher · View at Google Scholar · View at Scopus
  31. A. Charnes, W. W. Cooper, and M. J. L. Kirby, “Chance-constrained programming: an extension of statistical method,” Optimizing Methods in Statistics, pp. 391–402, 1971. View at Google Scholar