Research Article

A LTS Approach to Control in Event-B

Table 2

The LTL formulate of basic requirements.

Requirement numberLTL formulate

Com0.1, Com0.2, Flow0.2□(¬brp U (snd_progress∧rcv_progress))
Flow1.2□(snd_failure→rcv_failure)
Flow1.3□(rcv_success→snd_success)