Research Article

A Building Energy-Saving Method of Small High-Rise Office Building Based on BIM Model

Table 2

Input parameter list.

CityGuangzhouBeijing

Dimension23.239.8
Thermal zoningHot summer and warm winterCold
Built-up area200
Building height3.5
Number of people in buildings10
Computational algebra2000
Population size100
Crossover rate0.6–1.00
Mutation rate0.005–0.01
Energy consumption calculation, indoor design parameters in refrigeration periodHumidity2626
Relative humidity50%50%
Moisture content10.62110.621
Air change times11
Date4.15–11.157.15–8.31
Energy consumption calculation, indoor parameter design during heating periodHumidity1618
Relative humidity50%50%
Moisture content5.67836.4987
Air change times10.5
Date1.15–2.1511.15–3.15
Peak heat load temperature5−16
Peak cold load temperature3536
Intermediate heat load temperature45
Intermediate cooling load temperature2222