Research Article

Preliminary Assessment of the Possible BWR Core/Vessel Damage States for Fukushima Daiichi Station Blackout Scenarios Using RELAP/SCDAPSIM

Figure 21

Maximum bundle temperature, water level, and reactor vessel pressure for scenarios with and without water injection after the start of core uncovery (all emergency water injection was terminated at 4.2 hours after reactor scram).
646327.fig.0021