Research Article

Economic Evaluation on the MOX Fuel in the Closed Fuel Cycle

Table 3

The reactor core performance of FBR with MOX fuel loaded.

ItemsValue

Length of cycle (EFPD)225
Reactivity loss (Δk/k%)4.25
Average burnup (GWd/tHM)105.19
Max. burnup (GWd/tHM)113.13
Mass of plutonium loading (ton)0.6
Mass of discharged plutonium from blankets each cycle (ton)0.192
Power fraction in the seed assemblies, BOC/EOC (%)96.62/93.78
Axial power peak factor, BOC/EOC1.239/1.199
Axial power peak factor, BOC/EOC1.197/1.197
Max. linear power density (kw/m)38.9
Conversion ratio, BOC/EOC1.09/1.137