Research Article

PMK-2, the First Integral Thermal-Hydraulics Tests for the Safety Evaluation of VVER-440/213 Nuclear Power Plants

Table 2

Cold leg breaks of different sizes.

No. of
tests
Project identificationTest acronymDate of
tests
Break size
%
ECCS configuration and/or main objectives

(1)OKKFT G-11G11-3519893.5Minimum ECCS configuration: 0 SIT, 1 HPIS
(2)OKKFT G-11CLB-14A199014.8Minimum ECCS configuration: 0 SIT, 1 HPIS
Core dryout, cladding temperature excursion and cooldown
(3)OKKFT G-11CLB-14B199014.8DBA case with ECCS configuration: 3 SITs and 1 HPIS
Core dryout, cladding temperature excursion and cooldown
(4)OKKFT G-11CLB-10A19901.0Minimum ECCS configuration: 0 SIT, 1 HPIS
Test with a classical SBLOCA break size
(5)AEKICLB-10B19941.0Minimum ECCS configuration: 0 SIT, 1 HPIS
Test of 1990 (1%CLB) is repeated with local void probes
(6)OMFB 0881/95OM5-BF19951.0Minimum ECCS configuration: 0 SIT, 1 HPIS
AM actions, primary bleed and feed
(7)PHARE SRR3/95PHS-0519990.5ECCS configuration: 0 SIT, 3 HPISs
Overfeeding by high pressure injection
(8)OAH-CAMPOAH-C119992.0ECCS configuration: 2 SITs, 0 HPIS
AM actions, secondary bleed and feed
(9)IMPAM-VVERIMP-120030.5ECCS configuration: 3 HPIS, 0 SIT
Post-LOCA cooldown, modelling ES-1.2 procedure in Paks NPP
(10)IMPAM-VVERIMP-31200430ECCS configuration: 0 HPIS, 0 SIT, 1 LPIS
LBLOCA during cooldown