Table 3

Hot leg breaks and primary to secondary leaks.

No. of
tests
Project identificationTest acronymDate of
tests
Break size
%
ECCS configuration and/or main objectives

(1)OKKFT G-11G11-7A19897.4ECCS configuration: 0 SIT and 1 HPIS
Hot leg break LOCA for comparison
(2)OKKFT G-11G11-7B19897.4DBA case with ECCS configuration: 3 SITs and 1 HPIS
Hot leg break LOCA for comparison
(3)OKKFT G-11G11-PS19884.7DBA case with ECCS configuration: 3 SITs and 2 HPISs
Study of system behaviour in PRISE conditions
(4)IAEA-SPESPE-3198911.8DBA case with ECCS configuration: 3 SITs and 3 HPISs
PRISE, SG safety valve remains open
(5)PHARE 4.2.6bPH4-PS19961.0DBA case with minimum ECCS configuration: 2 SITs and 1 HPIS
Pressuriser thermohydraulics when safety valve opens
(6)PHARE 4.2.6bPH4-SLB199732.0DBA case with minimum ECCS configuration: 2 SITs, 1 HPIS, 1 LPIS
Pressuriser surge line break, core dryout, refill, reflood
(7)PHARE 2.02PH2-PS19974.5Maximum ECCS configuration: 4 SITs and 3 HPISs
PRISE, SG safety valve stuck open, spray in PRZ, sec. bleed and feed
(8)PHARE VVER01PHV-1119984.5ECCS configuration: 2 SITs and 2 HPISs
PRISE, AM actions, spray in PRZ, secondary bleed and feed
(9)PHARE VVER01PHV-1219981.5ECCS configuration: 2 SITs and 2 HPISs
PRISE, AM actions, spray in PRZ, secondary bleed and feed
(10)PHARE VVER01PHV-1319980.7ECCS configuration: 1 HPIS and no SITs
PRISE, AM actions, spray in PRZ, secondary bleed and feed

Note: There are three types of breaks:
(i) hot leg break in tests no. 1 and 2,
(ii) leak on the pressuriser in tests no. 5 and 6,
(iii) primary to secondary leaks in tests nos. 3, 4, 7, 8, 9, and 10.