Research Article

Projected Salt Waste Production from a Commercial Pyroprocessing Facility

Figure 6

Comparison of OR salt waste generation rates for 100 MTHM/year facility for selective process (black curve) to non-selective process (NSP) with two different levels of fission product accumulation in the OR.
945858.fig.006