Research Article

Design of the VISTA-ITL Test Facility for an Integral Type Reactor of SMART and a Post-Test Simulation of a SBLOCA Test

Table 6

Major sequence of events for SBLOCA.

EventTimeTimeTime (s)Time (s)
SMART designVISTA-ITLMeasured VISTA-ITLCalculated VISTA-ITL

Break occurrence 0.00.00.00.0
LPP set pointLPPLPP131116.1
LPP reactor trip signalLPP + 1.1 sLPP + 0.66 s132118.1
Reactor trip signal—urve startLPP + 1.6 sLPP + 0.96 s132118.4
PRHRS actuation signalLPP + 2.2 sLPP + 1.32 s133118.8
PRHRS IV full openPRHRSAS + 5.0 sPRHRSAS + 3 s136121.1
SI signalSIASSIAS475372.8
SI startSIAS + 30 sSIAS + 18 s502395.8