Research Article
A Flooding Induced Station Blackout Analysis for a Pressurized Water Reactor Using the RISMC Toolkit
Figure 18
Limit surface for 100% (a) and 120% (b) cases: AC recovery time versus DG failure time. Note how the failure region (red area) expands if power increases from 100% to 120%.
(a) |
(b) |