Research Article

A Flooding Induced Station Blackout Analysis for a Pressurized Water Reactor Using the RISMC Toolkit

Figure 18

Limit surface for 100% (a) and 120% (b) cases: AC recovery time versus DG failure time. Note how the failure region (red area) expands if power increases from 100% to 120%.
(a)
(b)