Research Article

A Flooding Induced Station Blackout Analysis for a Pressurized Water Reactor Using the RISMC Toolkit

Table 4

Status of the two DGs (DG1 and DG2) and the PG switchyard as a function of the wave height using the NEUTRINO simulation code.

Wave height (m)DG1 statusDG2 statusOffsite power switchyard status

<17OkOkOk
17-18FailedOkOk
18–30FailedFailedOk
>30FailedFailedFailed