Volume 2015 (2015), Article ID 516470, 14 pages
http://dx.doi.org/10.1155/2015/516470
Research Article

An Improved Shuffled Frog Leaping Algorithm for Assembly Sequence Planning of Remote Handling Maintenance in Radioactive Environment

1School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China
2Dongguan Neutron Science Center, Dongguan 523890, China
3College of Mechanical & Automotive Engineering, South China University of Technology, Guangzhou 510641, China
4Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049, China

Received 2 October 2014; Revised 13 January 2015; Accepted 28 January 2015

Academic Editor: Massimo Zucchetti

Copyright © 2015 Jianwen Guo et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. J. L. Seminara and S. O. Parsons, “Nuclear power plant maintainability,” Applied Ergonomics, vol. 13, no. 3, pp. 177–189, 1982. View at Publisher · View at Google Scholar · View at Scopus
  2. W. B. Scott, W. I. Enderlin, A. D. Chockie, and K. A. Bjorkelo, “Good practices for effective maintenance to manage aging of nuclear power plants,” Nuclear Engineering and Design, vol. 134, no. 2-3, pp. 257–265, 1992. View at Publisher · View at Google Scholar · View at Scopus
  3. S. Martorell, V. Serradell, and G. Verdú, “Safety-related equipment prioritization for reliability centered maintenance purposes based on a plant specific level 1 PSA,” Reliability Engineering and System Safety, vol. 52, no. 1, pp. 35–44, 1996. View at Publisher · View at Google Scholar · View at Scopus
  4. H. Kinoshita, M. Teshigawara, M. Ito et al., “Remote handling devices in MLF,” Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, vol. 600, no. 1, pp. 78–80, 2009. View at Publisher · View at Google Scholar · View at Scopus
  5. EUROfusion, https://www.euro-fusion.org/fusion/jet-remote-handling/what-is-remote-handling/.
  6. I. Ribeiro, C. Damiani, A. Tesini, S. Kakudate, M. Siuko, and C. Neri, “The remote handling systems for ITER,” Fusion Engineering and Design, vol. 86, no. 9-10, pp. 471–477, 2011. View at Publisher · View at Google Scholar · View at Scopus
  7. J.-W. Guo, S. Wang, H.-B. Chen, Z.-Z. Sun, and Z.-C. Zhang, “An intelligent approach for remote handling maintenance sequence planning in radiation environment,” Journal of Chemical and Pharmaceutical Research, vol. 6, no. 4, pp. 543–552, 2014. View at Google Scholar · View at Scopus
  8. L. Wang, S. Keshavarzmanesh, H.-Y. Feng, and R.-O. Buchal, “Assembly process planning and its future in collaborative manufacturing: a review,” The International Journal of Advanced Manufacturing Technology, vol. 41, no. 1-2, pp. 132–144, 2009. View at Publisher · View at Google Scholar · View at Scopus
  9. R. H. Wilson and J.-C. Latombe, “Geometric reasoning about mechanical assembly,” Artificial Intelligence, vol. 71, no. 2, pp. 371–396, 1994. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  10. L. Kavraki, J.-C. Latombe, and R. H. Wilson, “On the complexity of assembly partitioning,” Information Processing Letters, vol. 48, no. 5, pp. 229–235, 1993. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at Scopus
  11. P. Jiménez, “Survey on assembly sequencing: a combinatorial and geometrical perspective,” Journal of Intelligent Manufacturing, vol. 24, no. 2, pp. 235–250, 2013. View at Publisher · View at Google Scholar · View at Scopus
  12. M. M. Eusuff and K. E. Lansey, “Optimization of water distribution network design using the shuffled frog leaping algorithm,” Journal of Water Resources Planning and Management, vol. 129, no. 3, pp. 210–225, 2003. View at Publisher · View at Google Scholar · View at Scopus
  13. M. Eusuff, K. Lansey, and F. Pasha, “Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization,” Engineering Optimization, vol. 38, no. 2, pp. 129–154, 2006. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  14. Japan Atomic Energy Agency, Technical Design Report of Spallation Neutron Source Facility in J-PARC, Japan Atomic Energy Agency, Ibaraki-ken, Japan, 2012.
  15. Z. Zhou, D. Yao, and P. Zi, “The research activities on remote handling system for CFETR,” Journal of Fusion Energy, vol. 34, no. 2, pp. 232–237, 2015. View at Publisher · View at Google Scholar
  16. K. Kershaw, B. Feral, J.-L. Grenard et al., “Remote inspection, measurement and handling for maintenance and operation at CERN,” International Journal of Advanced Robotic Systems, vol. 10, no. 382, pp. 1–11, 2013. View at Google Scholar
  17. N. Takeda, K. Akou, S. Kakudate et al., “Development of divertor cassette transporters for ITER,” in Proceedings of the 17th IEEE/NPSS Symposium on Fusion Engineering, vol. 2, pp. 925–928, October 1997. View at Scopus
  18. P. Desbats, F. Geffard, G. Piolain, and A. Coudray, “Force-feedback teleoperation of an industrial robot in a nuclear spent fuel reprocessing plant,” Industrial Robot, vol. 33, no. 3, pp. 178–186, 2006. View at Publisher · View at Google Scholar · View at Scopus
  19. F. Geffard, P. Garrec, G. Piolain et al., “TAO2000 V2 computer-assisted force feedback telemanipulators used as maintenance and production tools at the AREVA NC-La Hague fuel recycling plant,” Journal of Field Robotics, vol. 29, no. 1, pp. 161–174, 2012. View at Publisher · View at Google Scholar · View at Scopus
  20. S. Sanders, “Remote operations for fusion using teleoperation,” Industrial Robot, vol. 33, no. 3, pp. 174–177, 2006. View at Publisher · View at Google Scholar · View at Scopus
  21. A. Vale, D. Fonte, F. Valente, and I. Ribeiro, “Trajectory optimization for autonomous mobile robots in ITER,” Robotics and Autonomous Systems, vol. 62, no. 6, pp. 871–888, 2014. View at Publisher · View at Google Scholar · View at Scopus
  22. S. Terada, H. Kobayashi, H. Sengoku et al., “Design and development of a work robot to place ATLAS SCT modules onto barrel cylinders,” Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, vol. 541, no. 1-2, pp. 144–149, 2005. View at Publisher · View at Google Scholar · View at Scopus
  23. H. J. Lee, J. K. Lee, B. S. Park, and J. S. Yoon, “Bridge transported servo manipulator system for remote handling tasks under a radiation environment,” Industrial Robot, vol. 36, no. 2, pp. 165–175, 2009. View at Publisher · View at Google Scholar · View at Scopus
  24. J. K. Lee, B. S. Park, K. Kim, and H. D. Kim, “Design and fabrication of a servo-manipulator for use in the PRIDE facility,” in Proceedings of IEEE International Symposium on Assembly and Manufacturing (ISAM '09), pp. 417–421, November 2009. View at Publisher · View at Google Scholar · View at Scopus
  25. B. Elzendoorn, M.-D. Baar, R. Chavan et al., “Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality,” Fusion Engineering and Design, vol. 84, no. 2–6, pp. 733–735, 2009. View at Publisher · View at Google Scholar · View at Scopus
  26. N. Takeda, S. Kakudate, M. Nakahira, K. Shibanuma, and A. Tesini, “Development of a virtual reality simulator for the ITER blanket remote handling system,” Fusion Engineering and Design, vol. 83, no. 10–12, pp. 1837–1840, 2008. View at Publisher · View at Google Scholar · View at Scopus
  27. C. J. M. Heemskerk, M. R. De Baar, H. Boessenkool et al., “Extending Virtual Reality simulation of ITER maintenance operations with dynamic effects,” Fusion Engineering and Design, vol. 86, no. 9-11, pp. 2082–2086, 2011. View at Publisher · View at Google Scholar · View at Scopus
  28. J. Geng, D. Zhou, C. Lv, and Z. Wang, “A modeling approach for maintenance safety evaluation in a virtual maintenance environment,” Computer Aided Design, vol. 45, no. 5, pp. 937–949, 2013. View at Publisher · View at Google Scholar · View at Scopus
  29. S. Esque, J. Mattila, M. Siuko et al., “The use of digital mock-ups on the development of the Divertor Test Platform 2,” Fusion Engineering and Design, vol. 84, no. 2–6, pp. 752–756, 2009. View at Publisher · View at Google Scholar · View at Scopus
  30. R. Shuff, D. Locke, and D. A. Roulet, “ITER Hot Cell process operability analysis using discrete event simulation tools,” Fusion Engineering and Design, vol. 86, no. 9–11, pp. 1950–1953, 2011. View at Publisher · View at Google Scholar · View at Scopus
  31. E. Robbins, S. Sanders, A. Williams, and P. Allan, “The use of virtual reality and intelligent database systems for procedure planning, visualisation, and real-time component tracking in remote handling operations,” Fusion Engineering and Design, vol. 84, no. 7–11, pp. 1628–1632, 2009. View at Publisher · View at Google Scholar · View at Scopus
  32. H.-S. Park, S.-K. Kim, K.-W. Lee, C.-H. Jung, J.-H. Park, and S.-I. Jin, “The application of visualization and simulation in a dismantling process,” Journal of Nuclear Science and Technology, vol. 44, no. 4, pp. 649–656, 2007. View at Publisher · View at Google Scholar · View at Scopus
  33. H. S. Park, C. H. Choi, S. H. Kim, B. S. Park, K. H. Kim, and H. D. Kim, “Deployment analysis and remote accessibility verification for a maintenance task in a PRIDE digital mock-up,” Annals of Nuclear Energy, vol. 38, no. 4, pp. 767–774, 2011. View at Publisher · View at Google Scholar · View at Scopus
  34. A. R. Selva, R. C. Castro, and V. G. F. Frías, “Design of disassembly sequences using search strategies. Application of IDA* in state diagrams,” International Journal of Production Research, vol. 49, no. 11, pp. 3395–3403, 2011. View at Publisher · View at Google Scholar · View at Scopus
  35. Y. Xing, G. Chen, X. Lai, S. Jin, and J. Zhou, “Assembly sequence planning of automobile body components based on liaison graph,” Assembly Automation, vol. 27, no. 2, pp. 157–164, 2007. View at Publisher · View at Google Scholar · View at Scopus
  36. J. Ko, E. Nazarian, H. Wang, and J. Abell, “An assembly decomposition model for subassembly planning considering imperfect inspection to reduce assembly defect rates,” Journal of Manufacturing Systems, vol. 32, no. 3, pp. 412–416, 2013. View at Publisher · View at Google Scholar · View at Scopus
  37. G. Dini and M. Santochi, “Automated sequencing and subassembly detection in assembly planning,” CIRP Annals—Manufacturing Technology, vol. 41, no. 1, pp. 1–4, 1992. View at Publisher · View at Google Scholar · View at Scopus
  38. C. Morato, K. N. Kaipa, and S. K. Gupta, “Improving assembly precedence constraint generation by utilizing motion planning and part interaction clusters,” Computer-Aided Design, vol. 45, no. 11, pp. 1349–1364, 2013. View at Publisher · View at Google Scholar · View at Scopus
  39. T. G. Chen and R. B. Xiao, “Enhancing artificial bee colony algorithm with self-adaptive searching strategy and artificial immune network operators for global optimization,” The Scientific World Journal, vol. 2014, Article ID 438260, 12 pages, 2014. View at Publisher · View at Google Scholar · View at Scopus
  40. H. Xu, L. Xin, H. Wang, and N. Yang, “Distribution network planning based on improved genetic algorithm,” Guangdong Electric Power, vol. 23, no. 6, pp. 6–9, 2010. View at Google Scholar
  41. T.-G. Chen and C.-H. Ju, “A novel artificial bee colony algorithm for solving the supply chain network design under disruption scenarios,” International Journal of Computer Applications in Technology, vol. 47, no. 2-3, pp. 289–296, 2013. View at Publisher · View at Google Scholar · View at Scopus
  42. C.-H. Cheng, S. C. Ho, and C.-L. Kwan, “The use of meta-heuristics for airport gate assignment,” Expert Systems with Applications, vol. 39, no. 16, pp. 12430–12437, 2012. View at Publisher · View at Google Scholar · View at Scopus
  43. S. Lorpunmance and A. Sap, “An ant colony optimization for dynamic job scheduling in grid environment,” International Journal of Computer and Information Science and Engineering, vol. 1, pp. 207–214, 2007. View at Google Scholar
  44. P. De Lit, P. Latinne, B. Rekiek, and A. Delchambre, “Assembly planning with an ordering genetic algorithm,” International Journal of Production Research, vol. 39, no. 16, pp. 3623–3640, 2001. View at Publisher · View at Google Scholar · View at Scopus
  45. H.-E. Tseng, W.-P. Wang, and H.-Y. Shih, “Using memetic algorithms with guided local search to solve assembly sequence planning,” Expert Systems with Applications, vol. 33, no. 2, pp. 451–467, 2007. View at Publisher · View at Google Scholar · View at Scopus
  46. H. S. Wang, Z. H. Che, and C. J. Chiang, “A hybrid genetic algorithm for multi-objective product plan selection problem with ASP and ALB,” Expert Systems with Applications, vol. 39, no. 5, pp. 5440–5450, 2012. View at Publisher · View at Google Scholar · View at Scopus
  47. J.-F. Wang, J.-H. Liu, and Y.-F. Zhong, “A novel ant colony algorithm for assembly sequence planning,” The International Journal of Advanced Manufacturing Technology, vol. 25, no. 11-12, pp. 1137–1143, 2005. View at Publisher · View at Google Scholar · View at Scopus
  48. H. Shan, S.-H. Zhou, and Z.-H. Sun, “Research on assembly sequence planning based on genetic simulated annealing algorithm and ant colony optimization algorithm,” Assembly Automation, vol. 29, no. 3, pp. 249–256, 2009. View at Publisher · View at Google Scholar · View at Scopus
  49. Y. Wang and J. H. Liu, “Chaotic particle swarm optimization for assembly sequence planning,” Robotics and Computer-Integrated Manufacturing, vol. 26, no. 2, pp. 212–222, 2010. View at Publisher · View at Google Scholar · View at Scopus
  50. M. Li, B. Wu, Y. Hu, C. Jin, and T. Shi, “A hybrid assembly sequence planning approach based on discrete particle swarm optimization and evolutionary direction operation,” The International Journal of Advanced Manufacturing Technology, vol. 68, no. 1–4, pp. 617–630, 2013. View at Publisher · View at Google Scholar · View at Scopus
  51. Y. Wang and J.-H. Liu, “Chaotic particle swarm optimization for assembly sequence planning,” Robotics and Computer-Integrated Manufacturing, vol. 26, no. 2, pp. 212–222, 2010. View at Publisher · View at Google Scholar · View at Scopus
  52. M. Li, B. Wu, P. Yi, C. Jin, Y. Hu, and T. Shi, “An improved discrete particle swarm optimization algorithm for high-speed trains assembly sequence planning,” Assembly Automation, vol. 33, no. 4, pp. 360–373, 2013. View at Publisher · View at Google Scholar · View at Scopus
  53. G. Percoco and M. Diella, “Preliminary evaluation of artificial bee colony algorithm when applied to multi objective partial disassembly planning,” Research Journal of Applied Sciences, Engineering and Technology, vol. 6, no. 17, pp. 3234–3243, 2013. View at Google Scholar · View at Scopus
  54. A. Rahimi-Vahed and A. H. Mirzaei, “A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem,” Computers & Industrial Engineering, vol. 53, no. 4, pp. 642–666, 2007. View at Publisher · View at Google Scholar · View at Scopus
  55. A. Rahimi-Vahed, M. Dangchi, H. Rafiei, and E. Salimi, “A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem,” International Journal of Advanced Manufacturing Technology, vol. 41, no. 11-12, pp. 1227–1239, 2009. View at Publisher · View at Google Scholar · View at Scopus
  56. X. Li, J.-P. Luo, M.-R. Chen, and N. Wang, “An improved shuffled frog-leaping algorithm with extremal optimisation for continuous optimisation,” Information Sciences, vol. 192, no. 1, pp. 143–151, 2012. View at Publisher · View at Google Scholar · View at Scopus
  57. C. Fang and L. Wang, “An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem,” Computers & Operations Research, vol. 39, no. 5, pp. 890–901, 2012. View at Publisher · View at Google Scholar · View at Scopus
  58. J.-Q. Li, Q. Pan, and S.-X. Xie, “An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems,” Applied Mathematics and Computation, vol. 218, no. 18, pp. 9353–9371, 2012. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus