Research Article
Reliability Evaluation of NPP’s Power Supply System Based on Improved GO-FLOW Method
Table 2
The failure frequency and mean repairing time of repairable components.
| Names of the units | Number of failure modes | Failure frequency (times per year) | Mean repairing time (hours) |
| The main steam turbine generator | 1 | | | The main offsite power | 1 | | | The auxiliary offsite power | 1 | | | Reserved diesel generator | 1 | | | The main transformer | 2 | | | | | The station service transformer | 2 | | | | | The auxiliary transformer | 2 | | | | | The main connection | 1 | | | Bus | 2 | | | | | Breaker of generator circuit | 1 | | | Breaker | 1 | | | Disconnector | 1 | 0 | 0 |
|
|