Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
Table 5
The range of generating instance.
| Parameter | (Lower bound, upper bound) |
| Construction time of the building of nuclear power plant | (25, 50) | Weight of order | (1, 2) | Preparation time (first) | (10, 20) | Preparation time (dependent) | (8, 18) | Number of reactors | (1, 3) | Capacity of reactor installation team | (16, 21) | Lower bound of time window | (65, 99) | Upper bound of time window | (95, 180) | Reactor installation time (first) | (18, 45) | Reactor installation time (dependent) | (20, 50) |
|
|