Research Article

Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach

Table 5

The range of generating instance.

Parameter(Lower bound, upper bound)

Construction time of the building of nuclear power plant(25, 50)
Weight of order(1, 2)
Preparation time (first)(10, 20)
Preparation time (dependent)(8, 18)
Number of reactors(1, 3)
Capacity of reactor installation team(16, 21)
Lower bound of time window(65, 99)
Upper bound of time window(95, 180)
Reactor installation time (first)(18, 45)
Reactor installation time (dependent)(20, 50)