Research Article
Radiation Protection Practices during the Helium Circulator Maintenance of the 10 MW High Temperature Gas-Cooled Reactor-Test Module (HTR-10)
Figure 3
The gas insulation during the removal of the helium circulator.
(a) Original status |
(b) Before lifting-up |
(c) During lifting-up |
(d) During separation |
(e) After separation |