Research Article

Radiation Protection Practices during the Helium Circulator Maintenance of the 10 MW High Temperature Gas-Cooled Reactor-Test Module (HTR-10)

Figure 3

The gas insulation during the removal of the helium circulator.
(a) Original status
(b) Before lifting-up
(c) During lifting-up
(d) During separation
(e) After separation