Research Article

Feasibility Studies on Pyro-SFR Closed Fuel Cycle and Direct Disposal of Spent Nuclear Fuel in Line with the Latest National Policy and Strategy of Korea

Table 8

Probability distribution function of nuclear fuel cycle process costs and reactor cost (based on 2016 USD).

CategoryProbability distributionMinMaxMeanUnitReferences

UraniumTriangular [37]58409219$/kgU[1418, 21, 3537, 4044]
ConversionUniform [12]63314$/kgU[1418, 21, 3537, 4044]
EnrichmentUniform [12]262411481$/SWU[1418, 21, 3537, 4044]
PWR fuel fabricationTriangular [37]281422346$/kgHM[1418, 21, 3537, 4044]
PHWR fuel fabricationTriangular [37]60186152$/kgHM[1721, 35, 36, 43]
UO2-pyroprocessTriangular [37]8824,8193,064$/kgHM[1416, 1820, 35, 36]
SFR-pyroprocessTriangular [37]1,3925,6923,786$/kgHM[1416, 1820, 35, 36]
SFR fuel fabricationTriangular [37]2,2978,6804,939$/kgHM[1416, 1820, 3537, 40, 42]
PWR IS&TTriangular [37]133925480$/kgHM[1421, 3537, 4043]
PHWR IS&TTriangular [37]64701393$/kgHM[1721]
Pyroprocess HLW (storage)Triangular [37]124,561231,612199,692$/m3[15, 16, 19, 20]
LILW-SL disposalTriangular [37]3,4654,1703,818$/m3[15, 16, 37, 40]
LILW-LL disposalTriangular [37]9,24011,1219,867$/m3[15, 16, 37, 40]
PWR final disposalTriangular [37]5212,2451,107$/kgHM[14, 1721, 37, 4043]
PHWR final disposalTriangular [37]106699519$/kgHM[1721]
Pyroprocess disposalTriangular [37]17,361493,893296,539$/kgHM[14, 15, 1820, 37, 40, 41, 43]
PWR overnightTriangular [37]1,9197,0184,746$/kWe[17, 18, 37, 43]
PHWR overnightTriangular [37]1,9033,2682,587$/kWe[37]
SFR overnightTriangular [37]2,3319,1996,115$/kWe[17, 18, 40, 43]

IS&T: interim storage and transportation; HLW: high-level waste; LILW-SL: low intermediate level waste-short-lived; LILW-LL: low intermediate level waste-long-lived; Min: minimum; Max: maximum; kgU: kilogram uranium; SWU: separative work unit; KgHM: kilogram heavy metal; m3: cubic meter; USD: US dollar. are adopted from different sources, normalized to 2016 USD, statistically analyzed, and presented in this table.