Research Article

ROSA/LSTF Tests and Posttest Analyses by RELAP5 Code for Accident Management Measures during PWR Station Blackout Transient with Loss of Primary Coolant and Gas Inflow

Figure 24

TR-LF-16 test and RELAP5 results for primary and SG secondary-side pressures in loop A.
(a) Overall transient (0–16000 s)
(b) Local transient (2000–16000 s)