ROSA/LSTF Tests and Posttest Analyses by RELAP5 Code for Accident Management Measures during PWR Station Blackout Transient with Loss of Primary Coolant and Gas Inflow
Table 3
Chronology of major events in LSTF tests.
Event
Time (s)
TR-LF-18
TR-LF-17
TR-LF-16
Break valve open, termination of feedwater in both SGs, and scram signal
0
Start of primary coolant pumps coastdown
19
Start of core power decay
21
Stop of primary coolant pumps
269
Empty PZR
145
370
410
Onset of SG secondary-side depressurization by fully opening relief valves in both SGs
602
1210
8
Onset of AFW injection into secondary-side of both SGs
615
1220
26
Initiation of ACC system in both loops
1200
1870
1470
Termination of ACC system in loop-A
2820
3810
6830
Termination of ACC system in loop-B
3040
4000
7320
Achievement of SG secondary-side liquid level up to 12 m
6000
7200
5600
Onset of primary depressurization by fully opening PZR relief valve
None
9400
12520
Primary pressure decrease to 1 MPa
7000
12900
15300
Start of coolant injection from low-pressure injection system into cold legs in both loops