Research Article
Shielding Design and Dose Evaluation for HTR-PM Fuel Transport Pipelines by QAD-CGA Program
Table 2
and
D40y at
Dpi = 30 cm for 1–5 m pipelines for the spent fuel source term.
| Pipeline length (m) | (mGy/h) | D40y (Gy) | With no shielding | 4 cm lead shielding | With no shielding | 4 cm lead shielding |
| 1 | 227 | 2.72 | 7.97 × 104 | 953 | 2 | 286 | 2.85 | 1.00 × 105 | 999 | 3 | 306 | 2.86 | 1.07 × 105 | 1000 | 4 | 314 | 2.86 | 1.10 × 105 | 1000 | 5 | 318 | 2.86 | 1.11 × 105 | 1000 |
|
|