Research Article
Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
Table 2
Comparison of PRIDE and the target facility of this study (for regular operation).
| Design parameter | PRIDE | Target facility |
| Cell volume | 1,230 m3 | 7,560 m3 | No. of inlet ports | 20 | 106 | Shape of inlet port | Circular | Square | Area of inlet port | 0.033 m2 | 0.1008 m2 | Space between inlet ports | Not identified | 1.261 m | No. of outlet ports | 14 | 74 | Shape of outlet port | Rectangular | Rectangular | Area of outlet port | 0.3024 m2 | 0.3024 m2 | Space between outlet ports | Not identified | 0.952 m |
|
|