Research Article

Seismic Fortification Analysis of the Guoduo Gravity Dam in Tibet, China

Table 4

Three-dimensional stress and displacement results of the five typical dam monoliths (Case  1).

Max.Min.
Left dam monolithsOverflow dam monolithsSand sluicing dam monolithsDiversion dam monolithsRight dam monolithsLeft dam monolithsOverflow dam monolithsSand sluicing dam monolithsDiversion dam monolithsRight dam monoliths

Case  1Displacement (cm)
0.3920.6480.6570.6970.5750.0710.1120.140.08790.0896
−0.164−0.261−0.282−0.173−0.156−0.343−0.679−0.626−0.596−0.559
Horizontal principal stress (MPa)2.3080.5320.3081.2832.221−2.481−3.16−2.449−3.232−2.709

Note: represents river direction and represents transverse direction (“−” denotes settlement direction).