Research Article
Deformation and Failure Mechanism of Roadway Sensitive to Stress Disturbance and Its Zonal Support Technology
Figure 8
Simulated roadway excavation process and the layout of observation stations. Note: first to tenth denotes the excavation sequence; one to ten denotes the observation station.
(a) Roadway excavated through the normal fault (from the hanging wall to the foot wall) |
(b) Roadway excavated through the normal fault (from the foot wall to the hanging wall) |