Research Article
New Bridge Weigh-in-Motion System Using Piezo-Bearing
Table 2
Values of peaks identified in time histories of loads measured by BWIM bearings (80 km/h).
| Entrance side | Peak | Occurrence time (s) | Measured load (kN) | (kN) | Joint 334 | Joint 335 | Joint 336 | Joint 337 | 1 | 0.14 | −0.84606 | 0.0354 | 21.00938 | 19.18984 | 39.38856 | 2 | 0.33 | −5.61803 | 4.84041 | 99.05302 | 97.02933 | 195.3047 | 3 | 0.50 | −13.80111 | 22.30247 | 162.27767 | 178.95248 | 349.7315 |
| Exit side | Peak | Occurrence time (s) | Measured load (kN) | (kN) | Joint 342 | Joint 343 | Joint 344 | Joint 345 | 1 | 1.81 | −19.11155 | 45.99867 | 140.47757 | 191.21095 | 358.57564 | 2 | 2.00 | −11.18191 | 17.09516 | 169.91835 | 177.35358 | 353.18518 | 3 | 2.19 | −3.80146 | −3.96868 | 101.25288 | 88.11671 | 181.59945 |
|
|