Research Article

Application and Development of an Environmentally Friendly Blast Hole Plug for Underground Coal Mines

Table 7

Main test parameters between traditional clay stemming and new plug.

Items2415 roadwayReturn entry
Clay stemmingPlugRatioClay stemmingPlugRatio

Hole depth (m)1.81.82.52.5
Cycle number (number)31318282
Cycle charge (kg)21.817.0128%96.484.6114%
Footage driving cycle (m)1.501.6392%2.22.492%
Unit explosive consumption (kg/m3)1.411.01140%1.981.59125%
Blast hole utilization factor (%)83.390.592%88.088.999%
Cyclic block number (piece)8.42.8300%9.23.3279%
Half-hole marks (strip)2.58.330%3.88.943%
Cyclic over excavation (cm)5.14.2121%6.34.8131%
Dust concentration (mg/m3)336228147%456387118%
Harmful gas content (L/kg)3833115%3431110%
Blockage cost (RMB/m)16.0016.6396%28.6437.5876%

Ratio, the ratio of clay stemming to plug.