Research Article
Optimization Analysis of Controlled Blasting for Passing through Houses at Close Range in Super-Large Section Tunnels
Table 3
Parameters of the upper step after optimization.
| Detonator segment | Hole depth (m) | Hole number | Blast hole name | Explosive charge per hole (kg) | Single-stage charge (kg) |
| 1 | 2.5 | 1 | Cutting hole | 1.2 | 4.8 | 1 | 2 | 4 | Cutting hole | 0.9 | | 3 | 4.5 | 12 | Cutting hole | 1.5 | 18 | 5 | 4 | 12 | Cutting hole | 1.2 | 14.4 | 7 | 3 | 8 | Driving hole | 0.9 | 11.7 | 7 | 3 | 5 | Floor hole | 0.9 | 9 | 3 | 11 | Driving hole | 0.9 | 13.5 | 9 | 3 | 4 | Floor hole | 0.9 | 11 | 3 | 11 | Driving hole | 0.9 | 17.1 | 11 | 3 | 6 | Inner ring hole | 0.9 | 11 | 3 | 2 | Floor hole | 0.9 | 13 | 3 | 15 | Inner ring hole | 0.9 | 17.7 | 13 | 3 | 2 | Floor hole | 0.9 | 13 | 3 | 2 | Floor hole | 1.2 | 15 | 3 | 21 | Around hole (odd) | 0.3 | 18.3 | 15 | 3 | 20 | Around hole (even) | 0.6 | — | — | 42 | Damping hole | — | — | — | — | 4 | Empty hole | — | — | Total | — | 182 | — | — | 115.5 |
|
|
Note: the around hole of the upper section is filled with spacer charge (1 for odd holes and 2 for even holes).
|