Research Article
Vibration Characteristic of High-Voltage Tower Influenced by Adjacent Tunnel Blasting Construction
| Excavation site | Blasting parameters | Number of holes | Hole of depth (m) | Charge weight per hole (kg) | Delay | Explosive weight per delay (kg) |
| Upper bench | Cut holes | 6 | 1.2 | 0.6 | 1 | 3.6 | Auxiliary holes | 29 | 1.0 | 0.8 | 3, 5, 7, 9 | 23.2 | Peripheral holes | 31 | 1.0 | 0.29 | 11 | 8.99 |
| Second bench | Auxiliary holes | 40 | 1.0 | 0.57 | 1, 3, 5, 7, 9 | 22.8 | Peripheral holes | 16 | 1.0 | 0.29 | 16 | 4.64 |
| Lower bench | Auxiliary holes | 30 | 1.0 | 0.57 | 1, 3, 5, 7 | 17.1 | Bottom plate holes | 20 | 1.0 | 0.57 | 9 | 11.4 |
|
|