Study on the Vibration Effect of Short Footage Blasting Load on Surrounding Rock-Support Structure of Tunnel

Table 10

The cumulative value of displacement at each measuring point of profile 1-1 when the thickness of the concrete spray layer is 350 mm (mm).

Blasting timesArch bottomArch topLeft arch waistRight arch waist

315.74315.63414.57715.365
415.84515.75615.42115.957
516.25216.22116.24216.243