Review Article
Pipeline Performances under Earthquake-Induced Soil Liquefaction: State of the Art on Real Observations, Model Tests, and Numerical Simulations
Table 3
Experimental uplift displacement (extracted from [
31]).
| Test | Earthquake | Pipe | ID | Peak bedrock acc. (g) | Duration (s) | Diameter (m) | Depth to axis/diameter (−) | Uplift (m) |
| DC-02 | 0.22 | 25 | 5.00 | 1.5 | 0.676 | DC-02 | 0.22 | 25 | 5.00 | 1.1 | 0.816 | DC-02 | 0.23 | 40 | 5.00 | 1.5 | 0.754 | DC-02 | 0.23 | 40 | 5.00 | 1.1 | 1.512 | DC-03 | 0.22 | 25 | 5.00 | 1.5 | 0.337 | DC-03 | 0.22 | 25 | 5.00 | 1.1 | 0.436 | DC-03 | 0.23 | 40 | 5.00 | 1.5 | 0.264 | DC-03 | 0.23 | 40 | 5.00 | 1.1 | 0.447 | DC-04 | 0.21 | 25 | 5.00 | 1.5 | 0.559 | DC-04 | 0.21 | 25 | 5.00 | 1.1 | 0.894 | DC-04 | 0.22 | 40 | 5.00 | 1.5 | 0.286 | DC-04 | 0.22 | 40 | 5.00 | 1.1 | 0.687 | DC-04b | 0.08 | 25 | 5.00 | 1.5 | 0.143 | DC-04b | 0.08 | 25 | 1.42 | 1.5 | 0.154 | DC-04b | 0.09 | 40 | 5.00 | 1.5 | 0.018 | DC-04b | 0.09 | 40 | 1.42 | 1.5 | 0.096 | DC-04b | 0.09 | 50 | 5.00 | 1.5 | -0.022 | DC-04b | 0.09 | 50 | 1.42 | 1.5 | 0.357 | DC-07 | 0.09 | 25 | 5.00 | 2.0 | 0.025 | DC-07 | 0.09 | 25 | 1.42 | 2.0 | 0.269 | DC-07 | 0.10 | 40 | 5.00 | 2.0 | 0.027 | DC-07 | 0.10 | 40 | 1.42 | 2.0 | 0.110 | DC-10 | 0.17 | 18 | 3.33 | 1.5 | 0.182 | DC-10 | 0.17 | 18 | 0.95 | 1.5 | 0.193 | DC-10 | 0.18 | 25 | 3.33 | 1.5 | 0.058 | DC-10 | 0.18 | 25 | 0.95 | 1.5 | 0.236 | DC-10 | 0.18 | 36 | 3.33 | 1.5 | 0.013 | DC-10 | 0.18 | 36 | 0.95 | 1.5 | 0.289 |
|
|